
"July 2008"
Paint On Screen installation at the DC Metro Transit new command center. This screen is over 100 ft wide and 60 ft tall. It is scheduled for operation in the 2nd quarter of 2009.

"July 2008"
Paint On Screen installation at the DC Metro Transit new command center. This screen is over 100 ft wide and 60 ft tall. It is scheduled for operation in the 2nd quarter of 2009.